Forest of Dean

Rooflight and skylight installation in Cinderford, planned before anything is ordered.

Cinderford: former mining town, terraced housing. What that changes about getting glass into a roof is the whole of this page.

  • Covered from Gloucester
  • 15 years on Gloucestershire roofs
  • 10 year workmanship guarantee
From Gloucester by road
9 to 19 milesApproximate, and inside the 30 mile radius
Dominant roof stock
Forest of Dean sandstone under Welsh slateWhat the covering is decides the detail
The usual constraint
Solid stone walls and long approach lanesSettled at survey, before anything is ordered
Local character
former mining town, terraced housingRecorded for Cinderford specifically
In Cinderford

The work we do here, and where to read about it.

The local detail

Fifteen things worth knowing about Cinderford roofs, worth reading before the survey.

Cinderford was built for industry and it was built on a hill, and both of those facts show up in every rooflight survey done there. The terraces climb the slope in steps, so a row of eight houses can rise the better part of a full storey from one end to the other and the roof planes step with them. The town sits high and open on the eastern side of the Forest of Dean, which makes it one of the more exposed positions in Gloucestershire for wind and driving rain. And the housing is mostly late nineteenth and early twentieth century: modest, solidly built, stone or brick with render over it, and roofed in Welsh slate that is now well past its first century. Severn Skylights Gloucester travels out to Cinderford from the city. What follows is what the roofs there actually demand.

Cinderford terraces that step up the hill, and the roof planes that step with them

Where a terrace is built on a slope, the builder had two choices: run the eaves level and let the ground fall away underneath, or step each house up so the eaves line climbs in stages. Cinderford has a great deal of the second, and it changes the roof geometry in ways that matter at an opening.

A stepped terrace has a vertical face of masonry at every step, usually the party wall carried up above the slate and finished with a coping or a small parapet upstand. That upstand needs a cover flashing and a soaker detail where it meets the slate, and it is a place where water is already being managed before anybody adds a rooflight. Setting a new opening too close to a stepped party wall means the side soakers of the window and the abutment flashing of the wall are competing for the same course, which is a detail that can be built well and is frequently built badly. The clear distance from the frame to the abutment is measured at survey and the position moved a course or two if it is tight.

Exposure on the Cinderford ridge, and the headlap that answers it

Headlap on slate is the vertical distance a slate overlaps the head of the slate two courses below, and it is the number that keeps the roof dry. One hundred millimetres is the general figure for a moderate pitch in a sheltered position. Cinderford is not a sheltered position.

The town sits on high ground with a long open run to the south west, which is the direction the county’s driving rain comes from. Roofs there are commonly found running 115 or 125mm of headlap rather than 100, and where a previous roofer has laid to the minimum, the evidence is usually visible inside the loft as staining on the batten backs. A rooflight going into that roof matches what is there or exceeds it. The interleaved side soakers lap one another by the same figure as the slates, which makes every soaker deeper and increases the lead quantity, and the head flashing lap goes to 150mm as a floor rather than a target. That is worked out from a measured gauge on the actual slope, and the arithmetic behind it is on rooflights in natural slate roofs.

On Cinderford roofs Solid stone walls and long approach lanes.

Wind uplift over Cinderford, and the fixing pattern that resists it

Wind does not push a roof down. It creates suction over the surface, and the suction is highest at the edges, the ridge and the corners, which is exactly where an exposed hilltop roof loses slates first. A rooflight sitting in that surface is a rigid box fixed to timber, and the fixings are what hold it.

On an exposed Cinderford slope the fixing schedule is treated as a real number rather than a formality. Manufactured roof windows come with fixing brackets that go into the rafters or the trimmers either side, and the full set is used rather than the minimum. The trimmers themselves are doubled at head and cill and properly nailed or screwed into the rafters they bear on, because the uplift load on the frame ends up in those trimmers. Battens around the opening are checked and renewed where they are split, since a batten with an old fixing hole through it and a hundred years of service is not something to rely on at the one point in the roof carrying a concentrated load. Cut slates beside the frame are re-holed and, where too narrow to hole soundly, held with copper clips rather than left to friction.

Standing scaffold on a Cinderford garden that falls away

Rear gardens in a hillside terrace step down or up in a series of small retaining walls, and there is frequently nowhere flat wide enough to found a scaffold in the normal way. That is an access question and it is answered at survey rather than discovered on the first morning.

What it means in practice: sole boards and adjustable base plates on a graded surface, scaffold legs of unequal length, standards founded off a retaining wall only where the wall has been looked at properly, and sometimes a tower built off the rear elevation with ties into the masonry. Material comes in through the house or over a neighbour’s ground by agreement. Glass for a made-to-size flat roof unit over a rear extension may need extra hands or a mechanical lift where a lorry cannot get within fifty metres. All of that takes longer and it costs more, and it is priced from what the surveyor measured so the figure holds.

Forest of Dean

A long lane is a scheduling question, not an engineering one.

Read how we survey for this

Warm afternoon light across the Severn Vale, pasture, orchards and brick farmhouses
The Vale: brick and clay tile, and the flattest ground we work on.

Rendered fronts over Cinderford stone, and the ties a scaffold needs

A large share of the town’s houses are stone or early brick with a render finish over the top, some of it original lime render and a good deal of it a later cement render applied in the second half of the twentieth century.

Two things follow. Scaffold ties have to go somewhere, and a tie drilled into soft render that has debonded from the stone behind it is not a tie. Where the render sounds hollow on a tap test, ties go into a window reveal or through the opening instead, or the scaffold is designed to be independent and buttressed rather than tied. Second, a cement render trapping damp in a rubble stone wall is a known condition in the Forest, and where the top of the wall is wet the wall plate and rafter feet under it may be too. That gets checked with a moisture meter while the loft is open, because a trimmer is only as good as the timber it delivers its load into.

Cinderford’s Victorian slate, iron nails, and the roof that moves when you touch it

Nail sickness is the condition where the slates themselves are sound but the ferrous nails holding them have corroded away, so the covering is effectively resting on itself and on friction. It is common on late Victorian roofs across the county and it is the single most important thing to establish before quoting a rooflight into an old Cinderford slope.

The signs are readable from the ground with binoculars: slipped slates, a scatter of lead tabs from previous work, a wavy line to the courses. From inside the loft the nail heads have gone and the slate heads sit loose on the battens. On a roof in that state, disturbing one square metre does not stay one square metre, because the slates above the working area were being held by the ones just taken out. The honest answer at survey is that the slope wants stripping and re-slating as its own piece of work with the opening formed as part of it, and saying that before the scaffold goes up is a great deal better than finding it out on the first morning. Copper or aluminium nails go back, not iron.

Driving rain from the south west, and which Cinderford elevation gets it

Exposure is directional. On a terrace running roughly north to south, the west facing slope takes the weather and the east facing slope is comparatively sheltered by the ridge of the roof itself, and the difference in condition between the two sides of the same roof is often obvious once you are up there.

That has a practical use. Where a room can be lit from either slope, putting the opening on the sheltered side reduces the water load on the perimeter detail for the whole life of the installation, and it is worth a conversation even where the exposed slope is the one the room would prefer. Where the exposed slope is the only option, the detail is upgraded rather than the position compromised: a wider side flashing than the kit minimum, a deeper head lap, and the underlay dressed up over the head of the frame and stapled to the batten above rather than slit and tucked. Water crosses every covering in a wind. The membrane is what catches it, and it has to run outside the frame.

Welsh slate is unforgiving of a badly set out opening and excellent once one is set out well.

Party walls and shared slopes in a stepped Cinderford terrace

In a terrace, the roof is one continuous structure interrupted by party walls, and the rafters at the party line often bear on a shared wall plate. Where the party wall is carried up through the slate the two roofs are separate planes. Where it stops at ceiling level, which happens on some earlier work, the roof void is continuous and the slate runs across without a break.

Both situations affect a rooflight. Trimming a rafter that sits directly against a party wall transfers load in one direction only, which is a different calculation from a rafter with a bay either side. Scaffold, access and any work touching the party structure may bring the Party Wall etc. Act into play, and where it does, the notice is served in good time rather than at the last minute. And on a continuous roof void, the loft next door is right there behind the party line, which governs how the work is sheeted and how the opening is closed each evening.

A Forest of Dean sandstone terrace under a Welsh slate roof, woodland behind
The covering

Welsh slate over Forest sandstone: a thin covering on a heavy building.

Forest of Dean sandstone under Welsh slate, which is what the survey is looking at before it looks at the glass.

Flat roofed rear extensions behind Cinderford houses

Behind a lot of the town’s terraces there is a flat roofed rear extension, garage or utility, and these are where a made-to-size rooflight does the most obvious good because the room underneath usually has one small window and a lot of wall.

The upstand is the whole job. The standard is 150mm measured from the finished surface of the waterproofing at the highest point of the fall, not from the deck and not from the lowest corner. That number exists because standing water, snow and wind-driven rain all climb, and on an exposed Cinderford site the wind-driven part is doing more work than it would in the vale. The kerb is treated timber, insulated on its outside face so it is not a cold ring around the glass, with the waterproofing dressed up and over the top so the upstand becomes part of the roof rather than a joint fighting the roof. Falls matter as much as height: a flat roof is designed at around 1:40 so that after deflection the finished fall is still no shallower than 1:80. Where the existing deck already ponds at the position wanted, the deck is re-falled first. The detail is on flat roof rooflight installation.

A loft room in a Cinderford two-up two-down, and the escape opening

Converting the roof space of a small terrace is common in the town and the roof geometry is tight: a modest span, a purlin across the middle, and collars that may be at head height. Headroom decides whether the conversion works at all, and the rooflight decides whether the regulations are satisfied.

Where a roof window forms the escape opening from a loft room, the clear openable area must be at least 0.33 square metres with a minimum of 450mm in both height and width, and the bottom of that opening between 800 and 1100mm above the floor. A fixed unit in that position does not satisfy it, and specifying a fixed pane to save money is a mistake that gets discovered at inspection. On a steep pitch, meeting the 800 to 1100mm band while also clearing a purlin at mid height is the constraint that sets the window position, and it is worked out on paper before anything is ordered.

A steep Cinderford rear slope, a tall reveal, and reaching the sash

Pitches of 40 to 45 degrees are normal on the town’s older stock, and a steep pitch changes the room. The reveal becomes a tall box, the head of the frame sits high above the floor, and reaching an opening handle from standing height stops being realistic on anything but the smallest unit.

The reveal is worth building deliberately rather than boxing in with the nearest plasterboard. A vertical lining above the window throws light deeper into the room. A horizontal lining below it lets warm air off a radiator rise straight up the face of the glass, which is the cheapest condensation control available. Splaying both sides widens the beam of light and costs another half day of carpentry and plastering, which on a north facing Cinderford bedroom is the difference between a bright room and a lit one. Insulation runs tight to the frame with the vapour control layer taped to it, not trimmed short. For reach, the options are a top hung sash with a bottom rail handle, a rod and hook pole, or an electric opener with a rain sensor.

Lead flashing and side soakers dressed neatly around a rooflight frame in a slate roof
The covering

Welsh slate over Forest sandstone: a thin covering on a heavy building.

Forest of Dean sandstone under Welsh slate, which is what the survey is looking at before it looks at the glass.

Glass for an exposed Cinderford roof: noise, solar gain and safety

Safety glazing in a roof is not a choice: a toughened outer pane, and a laminated inner pane wherever there is habitable space, a stairwell or a bath below. The laminated inner has a second benefit that surprises people on an exposed site, which is rain noise. A laminated pane damps the drumming that a single sheet of toughened glass makes in heavy rain, and on a hilltop roof that takes weather from the south west, that is noticeable in a bedroom.

Thermal specification has moved a long way. A 1990s double glazed roof window sits around 2.8 to 3.0 W/m2K. A current manufactured unit runs about 1.0 to 1.4, and triple glazing lower again. A low emissivity coating on the inner pane reflects long-wave heat back into the room, which is the one that matters on a cold exposed slope. A solar control coating on the outer pane cuts incoming heat, which matters on a south or west facing loft room where the glass is overhead at the hottest part of the day. The numbers are set out on energy efficient rooflights.

What moves the figure on a Cinderford job

No prices are published, because a narrow roof window into a sound slate slope with a driveway to park on and a lantern over a rear extension up a stepped garden are not the same job at any figure.

  • Access, which on a hillside terrace is often the single biggest variable: how scaffold gets in, whether it can be founded flat, and how far material is carried.
  • The condition of the slate and whether nail sickness is in play on the slope being worked.
  • Whether any structural work is needed, from a doubled timber trimmer to a flitch plate or a small steel.
  • The size wanted against the rafter centres actually measured, which decides whether the previous point applies at all.
  • Exposure, which increases the lead quantity through deeper soakers and wider flashings.
  • How many units, and whether one scaffold covers them all.
  • Glass specification, and whether the unit is fixed, manual, rod operated or electric.
  • How far the internal finish is taken: reveal, insulation, plaster and decoration.

Then two figures, in this order: an indicative range by email from photographs, then a fixed price after a survey, itemised so it is clear what is unit, what is labour, what is scaffold and what is Building Control. That is described at costs.

Welsh slate is unforgiving of a badly set out opening and excellent once one is set out well.

Working in Cinderford from Gloucester, and the first email

Cinderford is well inside the thirty miles by road Severn works within, over the Severn and up the eastern side of the Forest. The other Forest towns each have their own page, and the full list is at areas we cover. The workmanship carries a ten-year guarantee. The roof is never left open overnight, which governs the sequence rather than the other way round: where several units go into one elevation, the work runs from the top of the slope downwards so every evening ends with a closed roof.

Send info@severnskylightsgloucester.co.uk a photograph of the roof taken far enough back to show the whole slope and the ground in front of it, a photograph of the room from inside, the covering if you know it, and the address. The ground in front matters more in Cinderford than almost anywhere else in the county, because it is what decides how the scaffold gets built.

Also covered: Forest of Dean

Near Cinderford, and the towns either side of it.

Get a quote

Send the roof over and we will tell you what it needs.

  • An indicative range by email from photographs and rough measurements.
  • A fixed price after a survey, written against what was measured.
  • 10-year workmanship guarantee, and the Building Control notification handled.

Tell us about the roof

We will come and look at it, and tell you honestly what it needs.