Guide: Roof Window Installation

Rooflights on a shallow pitch below 15 degrees

Below fifteen degrees a pitched roof stops behaving like a pitched roof, and the whole approach to glazing it changes. Manufactured roof windows are rated from about fifteen degrees upward because that is the angle at which their flashing sets and their sash drainage were tested, so on a ten degree slope the correct product is a kerb-mounted unit sitting on an upstand rather than a window laid in the plane of the covering. In most cases the covering is the first thing to fail anyway: tiles and slates have their own published minimum pitches, and those are usually higher than the window’s. This page deals with the band between roughly three and fifteen degrees, which is where a large share of Gloucestershire’s rear additions, lean-tos, 1960s estate roofs and Cheltenham mansard tops actually sit. The general roof window job, for slopes above the threshold, is on the roof window installation page.

What happens to water on a ten degree slope

Water on a 45 degree roof leaves fast and leaves in a straight line. Water on a ten degree roof does neither.

Gravity’s component along the slope drops with the sine of the pitch, so at ten degrees the force pulling water down the roof is about a quarter of what it is at 45. The film of water on the surface is thicker and slower. Wind blowing across the roof can push that film sideways or briefly uphill. Surface tension holds it against edges instead of letting it drip. Every one of those effects works against a joint that assumes water travels downhill and only downhill, which is precisely what a standard flashing set assumes.

Capillary action, and the reason laps grow as pitch falls

Two surfaces close together with water between them draw the water into the gap regardless of gravity. That is capillary action, and it is the mechanism that puts water under a tile lap on a shallow roof.

The published headlap for a covering rises as pitch falls for exactly this reason. A concrete interlocking tile might want 75mm at 30 degrees and 100mm at 22.5, and drop below its stated minimum and the manufacturer simply stops warranting it. The same principle governs the metalwork around an opening: a head flashing tucked 150mm under the course above at 35 degrees needs 200mm or more at 15, and any hand-formed piece gets a welt or an anti-capillary bend to break the path rather than relying on length alone. The individual components and their laps are set out on soakers, aprons and head flashings explained.

A roof slope at 15 degrees carrying a roof window, with a shallower dashed slope below it marked too shallow. 15° Roof window Too shallow Measured off the rafter, not the ceiling
Pitch decides which units are permitted at all. Most roof windows want 15 degrees as a minimum, and below that the manufacturer will not warrant the weathering, whatever the installer says. On the shallow rear extensions common in Gloucester it is worth measuring before choosing anything.

Wind uplift and driving rain arriving nearly flat

On a shallow slope, rain driven by a south-westerly arrives at a low angle relative to the roof surface, which means it hits laps and upstands close to head on rather than glancing off them.

Wind also generates more suction over a shallow roof than a steep one. Air passing over the ridge separates and creates negative pressure across the upper part of the slope, which lifts the tail of every tile it passes and lets air, and the water in it, get under the covering. That is why mechanical fixing requirements increase on shallow roofs, and why an opening formed in one has to have every cut tile at its sides clipped or nailed rather than left to sit on its own weight.

The covering usually reaches its limit before the window does

People arrive asking whether a roof window can go in a twelve degree roof. The more useful question is whether the covering on that roof is within its own rating, because frequently it is not.

Covering Typical minimum pitch What happens below it
Plain clay tile, double lap 35 degrees Not available on a shallow slope at all
Natural slate, large format, generous headlap 20 to 22 degrees Headlap rises steeply, then the material runs out
Clay pantile 22 degrees Water crosses the roll rather than running down it
Concrete interlocking tile, low pitch range 12.5 to 15 degrees Only specific profiles are rated this low, with increased lap and full clipping
Cotswold stone slate 45 degrees and above Never found on a shallow slope
Lead, zinc or single ply sheet 1 to 3 degrees Designed for it, on a fully supported deck

The practical consequence is that a genuinely shallow roof in Gloucestershire is either a low pitch concrete tile, a sheet covering, or a felt or membrane flat roof pretending to be a pitch. Each of those wants a different unit.

Low pitch kits, and the two things they change

Some manufacturers publish a low pitch flashing kit that takes a standard roof window down to around ten degrees on a suitable covering. It is a real product and it is worth knowing what it does.

It changes two things. The apron is deeper, so water leaving the bottom of the frame lands further down the slope on covering that is itself properly lapped. And the head detail is extended, so the tuck under the course above is longer and better welted. What it does not change is the sash drainage or the covering’s own rating, so a low pitch kit on a covering already below its minimum solves nothing. It also cannot be improvised: it is a different part number, ordered at the outset, and a standard kit cannot be stretched into it.

Kerb-mounted units, and the upstand measured on the vertical

Below the low pitch kit’s range, the answer is a kerb-mounted rooflight: a made-to-size unit set on a timber upstand built off the deck, with the covering dressed up and over the kerb.

The upstand is 150mm measured vertically from the finished surface of the covering at the highest point, which on a sloping roof means the kerb is not the same height all the way round. The downslope face has to be taller than the upslope face for the top of the kerb to sit level, or the kerb is built level in itself and packed at the low side. Either way, the 150mm is checked at the point where the covering surface is highest against it, because that is where water will be deepest in a storm.

The glass on that unit is then set at a minimum of about five degrees of its own, independent of the roof pitch, so that rain sheds and dirt washes off. On a ten degree roof, laying the unit in the plane of the roof already achieves that. On a three degree roof it does not, and the rake gets built into the top of the kerb. The kerb detail generally is on the flat roof rooflight installation page.

The high side of a kerb on a sloping roof

Any kerb standing above a slope creates an obstruction, and water arriving from above has to divide and pass around it.

Directly upslope of the kerb the flow slows and deposits whatever it is carrying: moss off the ridge, grit from the covering, leaf litter. Over a few winters that builds into a dam sitting against the one face of the upstand that is already the lowest relative to the water. The detail that answers it is a formed diverter or a small back gutter upslope of the kerb, throwing flow to both sides before it reaches the upstand, plus enough clear covering above the unit that the diverter has somewhere to discharge. On a wide unit that back gutter needs a fall of its own and cannot simply be a flat tray.

On a shallow roof the water arriving from above the unit is the problem, not the water landing on the glass.
An interwar hipped roof of the kind common across Gloucester suburbs
An interwar hipped roof of the kind common across Gloucester suburbs

Underlay and the drainage layer below the covering

On a shallow pitch the layer beneath the covering stops being a safety net and becomes a working drainage plane, because a meaningful quantity of water gets past the tiles in any strong wind.

That means the underlay laps get increased in line with the pitch, typically to 150mm or more horizontally, and it means the membrane must be properly supported so it forms a drape between rafters that carries water down rather than pooling in a slack bay. Around an opening the membrane is dressed in a shaped tongue over the head of the kerb or frame and taken into the drainage route at the sides, never slit. Where the roof has a fully boarded deck the water has nowhere to drape into, so the detail changes again. That layer is covered in full on the underlay and sarking around a pitched rooflight page.

Snow, silt and moss at the head of the unit

Snow sits on a shallow roof rather than sliding off it, and it sits longest against anything that stands up out of the surface.

A drift banked against the upslope face of a kerb melts from the bottom, and the meltwater has a head of standing water above it that a 150mm upstand exists to resist. That is the load case the figure was chosen for. Silt and moss do something similar over a longer timescale, and on a north-facing shallow slope in the Stroud valleys moss growth is heavy enough to change the effective pitch of the covering within a decade. Clearing the strip above a rooflight when the gutters are done is a small habit with a real effect.

Sheet coverings, and the units they suit

Lead, zinc, single ply and built-up felt are all designed to work at pitches a tile cannot approach, and a good number of shallow Gloucestershire roofs are covered in one of them.

On lead or zinc the unit sits on a kerb and the sheet is dressed up over it, with a welted or clipped detail at the top rather than a lapped one, and the standing seams and rolls have to be set out so none of them runs into the kerb at an awkward angle. On single ply the membrane is welded up the kerb and over, and the corners are prefabricated. On built-up felt the layers are dressed up the kerb in sequence with the cap sheet last. In every case the covering becomes continuous with the upstand rather than butting against it, which is the whole reason a kerb works where a flashing does not.

The 150mm projection limit on a roof that barely slopes

Permitted development for a roof alteration to a house sets a limit: the alteration must not project more than 150mm beyond the plane of the existing roof slope.

On a steep roof an in-plane window sits comfortably inside that. On a shallow roof, where the correct product is a kerb-mounted unit standing 150mm up plus the depth of the frame and glass, the total projection can exceed the limit, and then a planning application is needed rather than assumed. This catches people out because the shallow roof is often the least visible one on the house. Flats and maisonettes have no permitted development rights for roof alterations at all, and Article 4 directions remove rights street by street in parts of Gloucester and Cheltenham. The local planning authority is the only body that can confirm the position for an address, and a written answer before ordering is cheap.

Cheltenham mansard tops, hidden behind a parapet

Central Cheltenham is full of mansards: a steep lower slope visible from the pavement in Welsh slate, and a shallow upper slope at five to fifteen degrees behind a parapet, usually in lead, that nobody on the street can see.

That upper slope is where the rooflight goes, and it is almost always below the roof window threshold, so it is a kerb-mounted unit on a lead flat rather than a window in the slate. The real constraints there are the parapet gutters and their outlets: the position has to leave the falls alone, and on a terrace the outlets are frequently shared with next door. Much of this stock is listed, and consent is required for an alteration whether or not it can be seen, though visibility strongly affects what an officer will accept.

Vale lean-tos and the low pitch estate roofs

Two other shallow situations turn up constantly around Gloucester.

The first is the rear addition or lean-to on a Severn Vale terrace, often at 15 to 22 degrees in clay tile and sometimes lower where a later extension was built with a low pitch concrete tile. The run from gutter to abutment is short, commonly 1.8 to 2.4 metres, so the flashing laps a shallow pitch demands eat a large share of the available slope and the unit gets smaller than people hope. The second is the 1960s and 1970s estate roof at Quedgeley, Abbeydale or Bishops Cleeve, built at 12.5 to 17.5 degrees in a low pitch interlocking tile over trussed rafters. Those roofs are within their rating, they will take a low pitch kit on a suitable profile, and the trusses underneath decide the width, which is set out on the rooflights in a trussed roof page.

Pitch band against the unit that suits it

Measured pitch Unit type Weathering Main risk to manage
15 degrees and above Standard manufactured roof window Standard flashing kit for the covering Covering headlap at the lower end of the band
10 to 15 degrees Roof window with a low pitch kit, on a rated covering Deeper apron, extended head tuck Whether the covering itself is rated that low
5 to 10 degrees Kerb-mounted made-to-size rooflight Covering dressed up and over a 150mm upstand Water arriving from the slope above the kerb
3 to 5 degrees Kerb-mounted unit with rake built into the kerb Sheet or membrane covering welded or welted up the kerb Standing water and silt against the upstand
Below 3 degrees Treated as a flat roof Warm deck build-up, falls corrected first Ponding, which is corrected in the deck before anything goes on

What a survey measures on a shallow roof

Shallow roofs reward measurement over assumption, because a roof described as flat is frequently at six degrees and a roof described as pitched is sometimes at eleven.

  • The pitch, off a digital level, taken on the slope the unit is going into rather than on the main roof.
  • The covering, identified by profile and manufacturer where the tile is stamped, and its rated minimum pitch.
  • The actual headlap in place, measured at a verge or by lifting a tile.
  • Where the water goes at the bottom of the slope, and whether any gutter or outlet is shared.
  • The clear run of slope above the proposed position, which decides whether a back gutter has anywhere to discharge.
  • Deck construction: rafters and battens, or a boarded and fully supported deck.
  • Exposure and aspect, since a shallow south-west facing slope in the Forest is a harder case than the same pitch in a sheltered vale garden.

With those seven, the pitch band in the table above is settled and the unit type follows from it. The figure that matters most is the first one, and it is worth taking properly rather than estimating from the ground, because the difference between fourteen and sixteen degrees changes the product.

Get a quote

Send the roof over and we will tell you what it needs.

  • An indicative range by email from photographs and rough measurements.
  • A fixed price after a survey, written against what was measured.
  • 10-year workmanship guarantee, and the Building Control notification handled.

Tell us about the roof

We will come and look at it, and tell you honestly what it needs.