Answered: Flat Roof Rooflight Installation

Do flat rooflights need building regulations?

The short answer

Yes. Forming a new opening in a flat roof is notifiable work under the Building Regulations, and so is replacing an existing unit in most circumstances. This is separate from planning permission, which is a different consent asked of a different department, and having one has no bearing on whether you need the other. Several parts of the regulations touch a single rooflight at once, and the surprise for most people is how many. Severn submits the notification, books the inspections and closes the file out as part of the job. The wider installation sequence is on the flat roof rooflight installation page.

Where the requirement comes from, and what counts as notifiable

Building work is defined in the regulations to include the material alteration of a building, and cutting a structural opening through a roof deck is a material alteration by any reading. It changes the structure, it changes the thermal element, and it changes the ventilation of the room below.

Replacement is caught too. Swapping a failed unit for a new one of the same size is a replacement of a thermal element and a controlled fitting, which brings it within the regulations even where no structural work happens at all. The practical consequence is a completion certificate at the end, which is the piece of paper a buyer’s solicitor will ask for.

Structure, and the trimmer nobody sees afterwards

Cutting a joist transfers its load into trimmers at the head and cill of the opening, and those trimmers hand the load to the joists either side, which now carry more than they were designed for. Over one joist that is routine sizing. Over three or four it is a calculation.

Where the span or the load requires it, an engineer’s calculation goes in with the application: a deeper engineered timber, a flitch plate or a small steel, and often doubling of the flanking joists as well. On a flat roof this is checked against snow load, which in Gloucestershire varies with altitude, so an opening on the wolds above Northleach is calculated against a higher figure than the identical opening in the vale at Quedgeley.

The U-value the unit has to meet

Conservation of fuel and power sets the limiting standard. Current guidance gives 1.4 W/m2K for a replacement roof window and quotes rooflights in the vertical plane at 2.2, with performance measured in the plane the unit is actually installed in. Any current made-to-size flat rooflight is comfortably inside that, and good units run near 1.0.

The requirement is not only about the glass. Insulation continuity around the kerb forms part of the same check, and an upstand insulated on one face only is a cold ring around the frame that the reveal below will show up within a winter. Where a roof is being upgraded at the same time, the whole build-up gets looked at together. Glass options are on the energy efficient rooflights page.

Fire, escape and the distance to a boundary

Two separate fire questions arise on a flat roof, and only one of them applies to every job.

The first is escape. Where the room below is a loft conversion or a room in the roof, an escape window must give a clear openable area of at least 0.33 square metres with a minimum of 450mm in both height and width, and the bottom of the opening between 800 and 1100mm above floor level. A fixed flat rooflight cannot serve that duty. The second is the roof covering itself: where a rooflight sits close to a boundary, the plastics and the covering around it are restricted by their fire performance rating, which is why a polycarbonate dome within a metre or so of a boundary line can be a problem where a glass unit is not.

A fixed unit and an escape opening are two different things, and confusing them is an expensive mistake to discover at inspection.

Ventilation counted from the rooflight

Purge ventilation to a habitable room means an openable area of at least one twentieth of the floor area. Where a flat rooflight is the only opening in a room, or where an extension has left a room with no external wall of its own, the unit has to carry that duty and it therefore has to open.

Background ventilation is the other half. A trickle vent in the frame or an equivalent provision elsewhere in the room satisfies it, and on a kitchen or a bathroom there is an extract rate to meet as well. This is the requirement most often overlooked at design stage, because the room looks bright and feels finished and nobody thinks about the air until the inspector asks.

Safety glazing over habitable space

Glass overhead is a safety question and the specification follows from what is underneath it. The convention is a toughened outer pane, which breaks into blunt granules, and a laminated inner pane wherever there is habitable space, a stairwell, a bath or a shower below.

The laminate is what stops glass reaching the floor if the inner pane is broken, because the interlayer holds the fragments in the frame. Where a unit is over a bath or a shower it is treated as a critical location, and where it is over a stairwell the same applies with additional attention to how it will ever be cleaned. Polycarbonate and acrylic domes are covered under the same principle by their own impact classification.

Electrical work where the unit is powered

An electrically operated rooflight, a rain sensor or an integrated blind brings mains wiring into a roof void, and that is notifiable electrical work in its own right. It is either certified by a competent electrician and the certificate lodged with the Building Control application, or inspected and tested as part of the same submission.

Low voltage units running off a transformer are simpler, but the transformer still has a mains supply feeding it and that supply is the notifiable part. Options and the wiring routes involved are described on the electric rooflight installation page.

Building notice against full plans

There are two routes into the system and they suit different jobs.

Building notice Full plans
What is submitted A short notice describing the work Drawings, specifications and calculations
Start on site 48 hours after the notice After approval, typically several weeks
Approval before work None. Compliance is judged on site A formal decision you can rely on
Suits A single unit into an existing sound deck Structural work, a steel, several units, a conversion

A straightforward rooflight into a rear extension roof goes in under a building notice and gets two site visits. Anything with a calculation behind it goes full plans, because an approval in writing before the covering comes off is worth the extra weeks.

Inspections, the certificate, and the sale years later

The inspection points on a flat rooflight are the structural opening before it is covered, and completion. On a job with a designed trimmer the inspector wants to see the member in place and its bearings before anything goes over it, which sets the sequence for the week.

The completion certificate is issued in the homeowner’s name and it should be filed with the deeds. Missing paperwork surfaces at the point of sale, usually with a solicitor asking for it three weeks before exchange, and the retrospective route is a regularisation application which costs more and can require opening up finished work to prove what is underneath. Gloucester City, Cheltenham Borough, Tewkesbury Borough, Stroud District, Cotswold District and the Forest of Dean each run their own arrangements, and an approved inspector is the alternative route where a builder already has a relationship with one. Either way the file is closed out before the scaffold comes down, and the certificate is handed over rather than left to arrive by itself.

Get a quote

Send the roof over and we will tell you what it needs.

  • An indicative range by email from photographs and rough measurements.
  • A fixed price after a survey, written against what was measured.
  • 10-year workmanship guarantee, and the Building Control notification handled.

Tell us about the roof

We will come and look at it, and tell you honestly what it needs.